Satellite map of Bukowsko–Nowotaniec wind farm
The Bukowsko–Nowotaniec wind farm south of village Bukowsko, Poland, is the second wind-farm project planned by Martifer Renewables and REpower in Poland. The project "Bukowsko" comprises eight REpower MM92 turbines, each with a rated output of 2 megawatts (MW). This is the first wind-farm project undertaken in Poland by Germany's third-largest wind-turbine manufacturer.
Latitude: 49° 28' 34.19" N
Longitude: 22° 05' 9.60" E