Latitude and longitude of Upper Salmon Hydroelectric Development

Satellite map of Upper Salmon Hydroelectric Development

The Upper Salmon Hydro Development utilizes a portion of the residual head between Meelpaeg Lake Reservoir and Round Pond within the watershed of the Bay d'Espoir Hydroelectric Development in Newfoundland and Labrador. The plant operates at a normal supply level of 241 m under a net head of 51 metres. The average rated flow of 189.5 m3/s is used to generate 84 megawatts (MW) of electrical power with an average annual production of 541 GWh.

Latitude: 48° 11' 0.45" N
Longitude: -56° 10' 14.55" W

Read about Upper Salmon Hydroelectric Development in the Wikipedia Satellite map of Upper Salmon Hydroelectric Development in Google Maps

GPS coordinates of Upper Salmon Hydroelectric Development, Canada

Download as JSON