Madison Centre
Madison Centre (formerly known as M5 Commerce Centre) is a 530-foot (160 m) tall skyscraper under construction in the Downtown district in Seattle, Washington. It is scheduled to be completed in 2016 and have 36 floors.
Inglewood-Finn Hill was a census-designated place (CDP) in King County, Washington, United States. The population was 22,707 at the 2010 census.
Population: 22,707
Latitude: 47° 43' 13.76" N
Longitude: -122° 13' 54.01" W
Madison Centre (formerly known as M5 Commerce Centre) is a 530-foot (160 m) tall skyscraper under construction in the Downtown district in Seattle, Washington. It is scheduled to be completed in 2016 and have 36 floors.